DO I NEED A PERMIT FOR A HOME PROJECT IN BELLEVUE, KIRKLAND OR REDMOND?
All three cities exempt a one-story storage shed up to 200 sq ft and a low deck no more than 30 inches above grade, with conditions. Fence limits differ: Bellevue requires a permit only over 8 feet, Kirkland exempts fences up to 6 feet, and Redmond's code exempts fences up to 7 feet. Bellevue and Kirkland require a permit to replace a water heater or a furnace. A re-roof that replaces the roof sheathing needs a permit in Bellevue and Kirkland.
Permit or no permit, by project
| Project | Bellevue | Kirkland | Redmond |
|---|---|---|---|
| Detached shed | No permit up to 200 sq ft | Exempt up to 200 sq ft and 12 ft high, storage only | Exempt up to 200 sq ft, one story |
| Fence | Permit only over 8 ft | Exempt up to 6 ft | Exempt up to 7 ft |
| Deck | Permit if over 30 in above ground | Exempt up to 30 in, not over a basement or story below | Exempt up to 200 sq ft, 30 in or less, not attached, not serving the exit door |
| Retaining wall | Permit over 4 ft or with a surcharge | Permit over 4 ft | Exempt up to 4 ft with no surcharge |
| Re-roof | Permit only if sheathing is modified or replaced | Exempt like-in-kind if sheathing isn't removed or replaced | Lightweight roofing (under 4 lb/sq ft) exempt |
| Siding | No permit, except stucco and brick or stone veneer over 4 ft above grade | Non-structural exempt, except veneer, stucco or EIFS | Not in the exempt list; ask |
| Windows | Same size, same place: no permit | Like-in-kind exempt; new opening needs a permit | Exempt in existing openings if the size isn't changed |
| Water heater | Permit required | Permit required | Not in the exempt list; ask |
| Furnace or heat pump | Permit required | Permit required | Not in the exempt list; ask |
In Kent, Auburn and Renton, see permits in South King County. Fees: Kent building permit fees and Seattle building permit fees.
Bellevue
- Sheds, playhouses, private gazebos: no permit up to 200 sq ft, but setbacks, lot coverage, height and critical-area rules still apply.
- Fences: no permit unless over 8 feet. Fences over 4½ feet often can't be in front-yard setbacks.
- Decks: permit when the walking surface is more than 30 inches above ground, and for repairs to deck or porch handrails and stairs.
- Water heaters: replacing or moving one requires a permit. For an emergency replacement, get the permit by the first City work day after the work starts.
- Furnaces and heat pumps: installing, moving or replacing one, or replacing ductwork, requires a permit.
- Critical Areas Overlay: sites in it may need permits for work that is otherwise exempt.
- Contact: Permit Center, 425-452-4898, permits@bellevuewa.gov.
Kirkland
- Sheds: exempt only as one-story tool or storage sheds of 200 sq ft or less and 12 feet or less in height. An office or studio of any size needs a permit.
- Also needs a permit: tree removal, interior remodels, drywall work, garage conversions, ADUs, gas piping, fireplaces and wood stoves, and soil work over 50 cubic yards.
- Finish work such as painting, cabinets and countertops is exempt if accessibility features aren't changed.
- Exemptions don't apply in flood hazard, wetland, steep slope, shoreline or other critical areas. Driveway replacement and work in the right-of-way need a Public Works permit.
- Contact: Development Services, 425-587-3600.
Redmond
- Exempt under Redmond's amended code: one-story detached structures up to 200 sq ft, fences up to 7 feet, retaining walls up to 4 feet without a surcharge, and sidewalks, driveways and detached decks up to 30 inches above grade and not over a basement.
- Roofing: lightweight coverings such as composition or metal, installed at under 4 pounds per sq ft, are on the exempt list.
- Windows: replacement in existing openings is exempt if the opening size isn't changed and the operable opening isn't reduced.
- Everything else: water heaters, furnaces and siding aren't on Redmond's exempt building list. Ask the City before you start.
A regional MyBuildingPermit tip sheet (June 11, 2026) notes that work without a permit must still be code compliant, and that land use or zoning rules may still apply.
Frequently asked questions
Do I need a permit for a home project in Bellevue, Kirkland or Redmond?
Often yes. All three exempt a small storage shed up to 200 sq ft and a low deck no more than 30 inches above grade, with conditions, but water heaters, furnaces and many other projects need a permit. Each city sets its own list.
How tall can a fence be without a permit?
Bellevue requires a permit only for fences over 8 feet, Kirkland exempts fences up to 6 feet, and Redmond's code exempts fences up to 7 feet. Front-yard height limits can be lower.
Do I need a permit to replace a water heater in Bellevue?
Yes. Bellevue requires a permit to replace or move a water heater. For an emergency replacement, get the permit by the first City work day after the work starts.
Do I need a permit to re-roof in Kirkland?
Not for like-in-kind re-roofing of a one- or two-family home if the roof sheathing isn't removed or replaced. Work on structural elements, skylights or mechanical equipment needs a permit.
Can I build a backyard office without a permit in Kirkland?
No. Kirkland exempts sheds only when used for tool or storage. A detached office or studio of any size needs a permit.
Sources
- City of Bellevue — Work Requiring Commercial and Residential Permits
- City of Kirkland — Do you need a permit?
- Redmond Municipal Code 15.08.060 — Residential code amendments (R105.2)
- MyBuildingPermit.com — Tip Sheet 00, Permits Required and Not Required (June 11, 2026)
Sources accessed November 19, 2026.
This guide summarizes city pages and code. It is not legal advice. Confirm with the city before you build. See our disclosure and disclaimer.